by engineer | May 2, 2017 | Highway/Roadway Design
This design was funded by the Cherokee Nation which included reconstructing Chimney Rock Road from the SH-82 junction extending two miles east to the Chimney Rock Reservoir Bridge. The roadway reconstruction project included the following tasks: Adding 4ft shoulders...
by engineer | Dec 6, 2016 | Bridge Design, Highway/Roadway Design, Water, Sewer, Stormwater Design
GUY worked with the City of Broken Arrow (COBA) to design construction plans for widening Tucson St from Aspen Ave to Elm Pl. This 1.0 mile section of two lane, section-line roadway served approximately 6,000 vehicles per day. COBA needed to widen this roadway in...
by engineer | Oct 5, 2016 | Bridge Design, Highway/Roadway Design, Utility Relocation Coordination
SH-1 runs through Talihina, a small town in southeastern Oklahoma known as the beginning of the Talimena Scenic Drive. GUY designed approximately 6,000LF of embankment, roadway, surfacing, and drainage for a section of SH-1 located adjacent to and just west of...
by engineer | Oct 5, 2016 | Bridge Design
The original Brazil Creek bridge is a one-span rivet connected Double Intersection Warren through truss. The one-lane bridge was constructed in 1911, and few examples of this bridge style remain. To improve transportation and safety in LeFlore County, GUY replaced the...
by engineer | Oct 5, 2016 | Bridge Design
Bridge 20 over Clear Boggy Creek in Choctaw County was a one-lane truss bridge built in 1919. To replace this structurally deficient historic bridge, GUY designed a new 26ft wide, 135ft long, 6-span PC beam bridge. The original bridge remains in place. The project...