This project is located approximately 7 miles west of Nowata and 1.5 miles south of US-60. Guy Engineering Services has completed preliminary design, which involves replacement of a 56 ft. long I-beam span that is functionally obsolete and structurally deficient. The new PC Beam structore will span 180 feet, with a 26 ft. clear roadway. In addition, approximately 3600 ft. length of NS 4060 alignment will be improved to a design speed of 45 mph. The new bridge will be offset to the west of the existing bridge. The estimated project cost is $ 1.7 million.