Guy Engineering Services Inc. is designing the widening of Tucson Street, Aspen Ave. to Elm Pl. in Broken Arrow, OK. This $3 million dollar project involves widening the existing 2 lane roadway to a 5 lane roadway, including a two-way left turn lane. The project includes: minimizing impacts to electrical transmission poles, a new bridge culvert, and other storm sewer improvements. The project was initiated due to a high-profile development along the busy arterial street which connects to a large shopping center.