The Osage Nation improved this cut-through road between Wynona and Barnsdall. The total project includes ten miles of chip/seal recycling and overlay and drainage design including:
- RCP and RCB extensions
- New 3-75ft PC beam bridge
- New 3-14.5ft by 14.5ft RCB
- New 20ft by 6ft precast RCB
The roadway at the PC beam bridge was placed on a new alignment to improve safety, keep a low-water crossing open during construction, and allow the roadway to be passable during future flood events. Construction was funded by the Osage Nation and Osage County.