SH-9 over U.P.R.R.
This project replaced the existing 3-span I-beam bridge over the U.P.R.R. and constructed embankment roadway, surfacing, and drainage. The planned alignment was offset to the west, allowing the road to remain open during construction.

Project:SH-9 Bridge over U.P.R.R. Bridge and Approaches JP 21730
|
Client:Oklahoma Dept of Transportation |
Expertise Provided:Bridge and roadway design Shoofly design Traffic sequencing Utility relocation coordination Right of way mapping |
Location:ODOT District 1, McIntosh County, OK |