This project removed a 23ft timber beam span bridge with timber deck and abutments, replacing it with a 70ft PC beam span bridge. The project also included reconstructing 1,280ft of gravel roadway. By improving the roadway horizontal alignment and vertical profiles, GUY was able to design a safer roadway.