I-244 over Sheridan after bridge rehabThese two state bridge rehabilitation projects required continued coordination with ODOT and City of Tulsa due to the high traffic volumes, ADA compliance issues, traffic signalization, ramp configuration, and complex utilities. Services included survey, structural design, roadway and sidewalk design, and multi-phase traffic control plans.