This project design included restoration of approximately 500LF of eroded creek bank on Bird Creek, adjacent to the lagoons inside the wastewater treatment plant. Restoration included use of special graded riprap, longitudinal peaked stone toe protection and tree plantings. GUY coordinated with the Corps of Engineers for the 404 permit.

Awards: 2016 APWA OK Chapter Gold Award