GUY developed a design to improve safety, drainage, and connectivity on 4.0 miles of EW 55 Rd, also known as Anderson Rd. Because of its high accident rate, safety improvements are crucial on this section of road that stretches from N 437 Rd to SH-82 in Mayes County...
Drainage/Flood Control/Bank Stabilization
105th and Yale
As part of a City of Tulsa Stormwater On-Demand Design contract, GUY Engineering analyzed the 105th and Yale area. This area has a history of drainage issues, which had been worsened by recent development. GUY completed a drainage analysis and provided several...
Northside Wastewater Treatment Plant – Bird Creek Bank Stabilization
This project design included restoration of approximately 500LF of eroded creek bank on Bird Creek, adjacent to the lagoons inside the wastewater treatment plant. Restoration included use of special graded riprap, longitudinal peaked stone toe protection and tree...
Mingo Creek Access Roads and Bank Stabilization
This City of Tulsa project provided maintenance access to lower Mingo Creek, greatly reducing safety concerns for entering and exiting the site. The design added two concrete access ramps into the creek, concrete pavement creek crossing, turf reinforcement mat bank...
Centennial Park, Elm Creek Detention Basin
GUY Engineering planned and designed a 58-acre detention pond with concurrent park use and landscape features. This park has become the signature photo-op of Tulsa, transforming a blighted area into a vibrant community with redevelopment, farmer’s market, and public...
Crow Creek Drainage Improvements
This award-winning project provided relief from flooding in a historic area of Tulsa. The design team created a park-like detention facility into which a new storm sewer relief line could outlet. The design reduced the chance of flooding for 62 homeowners and removed...