This project replaced the existing 3-span I-beam bridge over the U.P.R.R. and constructed embankment roadway, surfacing, and drainage. The planned alignment was offset to the west, allowing the road to remain open during construction.
This project replaced the existing 3-span I-beam bridge over the U.P.R.R. and constructed embankment roadway, surfacing, and drainage. The planned alignment was offset to the west, allowing the road to remain open during construction.